Fincon - Five workers - Kenyon, Gilberto, Jose, Oscar, Eddie Fincon stripped all remaining laser forms from the first slab pour and cut the remaining concrete that needed to be cut. Fincon added laser forms so that all forms are added other than enough space for the screed to get inside for the pour. The ground was evened out around the plumbing and all over the floor so that it is as level and flat as possible. Blankets were placed over the rebar where the slab will be poured to help with frost protection on the ground. High Fly Rebar - High Fly Rebar added all of the rebar for the slab.
0 Comments
Fincon - Four workers - Oscar, Jose, Eddie, Ricardo - Fincon removed the blankets from the slab and stripped the laser forms.
Fincon - Nine workers for the pour - Chino, Izzy, Noel, Diego, Alexander, Jose, Ricardo, Kenyon, Cory 11 workers for cutting the concrete - Chino, Izzy, Noel, Fernando, Diego, Alexander, Luis, Jose, Armando, Ricardo, Kenyon Fincon poured and finished the first section of the floor of the building. 350 yards of concrete were provided by Jack B. Parson's Company and Dudley Concrete Pumping pumped the concrete. Fincon used power trowels to finish the concrete. Fincon then snapped lines for the lines and saw cut the concrete. Joint savers were placed in the cuts to avoid cracking where the cuts meet. Concrete blankets were placed over the concrete to avoid the damage to the concrete from freezing. JJ Laser Screed - JJ Laser Screed screeded the concrete at 6 inches. High Fly Rebar - High Fly Rebar set and tied the rebar in the laser forms one foot on center. Rebar was set and ready for the first 350 cubic yards of concrete to be poured on Friday. Dyer Excavation - Dyer Excavation worked on building a second entrance to the project and added a large washout for the concrete trucks and pump. Fincon - Styrofoam blockouts were added to each of the footings. Fincon put in four inch high laser forms around the project to prepare for the rebar so that the six inch floor can be poured. Fincon - Two workers - Chino, Noel Fincon stripped the FS12 spot footings. Dyer Excavation filled and compacted the FS12 spot footings. The two FS12 spot footings were inspected and poured by Fincon. Dudley Concrete Pumping pumped the concrete while Jack B. Parson provided the concrete. The two final spot footings were formed by Fincon. Rebar was placed by High Fly Rebar. Fincon added the bolt templates, anchor bolts, and pencil rods. Dyer Excavation filled and compacted the other spot footings. |
AuthorKenyon Finch Archives
April 2020
Categories |