Fincon - Fincon poured panels 12-24. The concrete was provided by Jack B. Parson's and the concrete was pumped by Dudley Concrete Pumping. Panels 12-24 were covered with concrete blankets. The panels that have not been poured yet were covered with snow tarps. Dyer Excavation - Dyer dug and compacted exterior footings.
0 Comments
Fincon - Fincon prepped the panels for the pour on Friday. Fincon added lifting eyes and adjusted the rebar to be ready to pour.
High Fly Rebar - High Fly put the rebar into the panels, Dyer Excavation - Dyer cleared a path on the other side of the building and began digging exterior footings. Fincon - More panels have been laid out and formed under the direction of Fincon. Reveals have also been laid down in many of the panels. High Fly Rebar - High Fly assembled rebar for the panels. |